| 
 
 | 
								
								
									
										
											| 
													Phillips 66 Terminal
												 The SedCon® Turbo Systems installed at the Phillips 66 Lake Charles, LA Terminal has the following characteristics: Four, 48-inch Turbo Units
125 hp hydraulic power source
Flood and ebb tide operation
38 ft water depth in berth
12 ft/yr previous shoaling rate
Installed in 2020
 |  | 
   
 
								
									
										|     |     |     |  
										| Move your cursor over thumbnail images above to see photos of the installation.
 |  |