linktohome




NuStar Asphalt Refining Company

The SedCon® Turbo System installed at the NuStar Asphalt Refinery Company terminal in Savannah, GA has the following characteristics:

  • Three, 42-inch Turbo Units

  • 75 hp hydraulic power source

  • Flood and ebb tide operation

  • 40 ft water depth in berth

  • 12 ft/yr previous shoaling rate

  • Installed in 1998

 


site assesment
citgoasph1 citgoasph1 citgoasph3 citgoasph4
Move your cursor over thumbnail images above
to see photos of the installation.

footer

emaillink